If you are planning to build, renovate, or launch a business space along the Outer Banks, understanding the builder’s permit process is essential for code compliance and long-term peace of mind.
A Complete Guide to New Construction, Remodeling & Commercial Project Permits
Building or renovating on the Outer Banks involves more than just gorgeous views.
Coastal development for residential new construction, remodeling, commercial projects on the Outer Banks involves a complex permitting process. CAMA regulations, FEMA flood maps, zoning codes, and a layered network of local approvals that differ by town and county.
At Premiere Contracting, Inc., we walk clients through each step to make the design-build process smoother and stress-free. We are seasoned in local rules, coastal-specific regulations, and providing construction guidance from zoning to final sign-off. This post lays out which permits matter, when you will need them, and what makes Outer Banks permitting different.
When You Do and Don’t Need a Permit
Not every construction project triggers permits, but plenty of them do. New construction always requires permits, but remodeling is not as cut and dry. In the state of North Carolina you are not required to seek a permit if your renovation project includes no structural changes and the cost does not exceed $40,000.
Here’s a quick breakdown of what permits are required vs not required to help you stay compliant:
Permits Not Typically Required
You usually do not need a permit for purely cosmetic upgrades, such as:
- Repainting walls or ceilings
- Replacing flooring (tile, LVP, hardwood, carpet)
- Swapping cabinets or countertops (no layout change)
- Installing new trim, baseboards, or crown molding
- Replacing doorknobs, faucets, or other hardware
These updates don’t touch structure or systems and are considered maintenance.
Projects That Do Trigger Permits
Even if the work is all indoors, you will likely need permits if your project includes any work that modifies the structure of the property including:
- Add, moving or removing interior walls (even non-load-bearing)
- Changing the floorplan or room function (like turning a bedroom into a bathroom)
- Replacing or relocating plumbing fixtures
- Electrical panel work, recessed lighting installs, or rewiring
- HVAC updates or ductwork changes
- Converting attics or garages to a conditioned living space
- Adding new egress windows or expanding existing ones
Why Permits Matter
Permits may seem like a lot of red tape, but at the end of the day, builder permits keep your home safe, legal, and market-ready. On the Outer Banks, permits help ensure:
Permits are tied directly to:
- Storm resiliency in high-wind and hurricane-prone zones
- FEMA regulations and required elevation certifications
- CAMA (Coastal Area Management Act) compliance if you’re within 575 ft of public waters
- Floodplain zoning and overlays
- Septic and well approvals where municipal services don’t exist
- Licensing and inspections for all trade professionals
Permits also shield you from delays during home sales, as unpermitted work can prevent closings or require expensive remediation.
Types of Builder Permits
Every construction project on the Outer Banks is shaped by layers of local, state, and federal permitting. Let’s dive into the major types of permit categories you will need to consider based on your project, plus why each one matters.
New Construction Home Permits

Building a custom home from the ground up? New construction homes need a full suite of permits and approvals to legally break ground.
These include the following…
Residential Zoning Permits
Residential zoning permits are especially relevant in towns like Duck, Southern Shores, and Corolla, where Planned Residential Developments (PRDs) add layers of local zoning codes.
A zoning permit confirms your lot meets town and county ordinances for:
- Minimum lot size
- Setbacks from property lines
- Use type (residential vs. commercial)
- Height restrictions
- Density (number of structures or dwellings)
New Construction Building Permits
New construction building permits authorize your home’s structural design and layout.
This permit covers your physical build, including:
- Foundations and pilings
- Framing and roofing
- Load-bearing walls
- Stairs, decks, and porches
- Final architectural layout
These building permits require full construction documents. You will need to submit detailed drawings or engineered plans, stamped by a licensed professional.
CAMA Permits
Residential CAMA permits are required if you’re building near the ocean, sound, marsh, or estuarine shoreline. Under the Coastal Area Management Act (CAMA), homes built within 575 feet of public waters need coastal review:
- CAMA Minor Permit: For residential projects under $250,000
- CAMA Major Permit: For larger builds or those impacting dunes, wetlands, or public access
CAMA ensures your construction protects public access and the fragile coastal environment, including dune stability.
Elevation Certificates
Most Outer Banks properties fall within flood zones. Your elevation certificate confirms compliance with FEMA floodplain regulations by:
- Verifying the base flood elevation (BFE)
- Showing compliance with local building codes
- Meeting requirements for flood insurance policies
- Being completed by a licensed surveyor or engineer
Elevation certificates are required if your site lies within a FEMA flood zone. This document verifies your home’s finished floor elevation meets local standards and ensures flood insurance eligibility.
We recommend looking at Dare County’s Flood Map to get a better understanding of where your property falls in the flood plain.
Septic & Well Permits
For residential properties without municipal sewer or water access. Your project may require:
- Septic System Permit: Based on the number of bedrooms & soil type
- Soil Evaluation (Perc Test): To confirm proper drainage
- Well Permit: If public water isn’t available
Outer Banks towns like Manteo, Buxton, and Southern Shores often require private septic and well systems.
Trade Permits
Regardless of project type, all mechanical, electrical, and plumbing work must be permitted and are always required for new builds. For new construction specifically, you will need separate permits for:
- Electrical wiring and service panels
- HVAC ductwork and units
- Plumbing lines, water heaters, and fixtures
Trade permits ensure only licensed contractors are completing the work to code.
Remodeling & Renovation Permits
Even if you are not building a home from scratch, permits are often still required. Renovation projects still carry their fair share of permitting requirements, especially here on the Outer Banks, where zoning rules, floodplain overlays, and CAMA regulations can apply even to small changes.
Even if you’re not starting from scratch, renovations still require permits if you’re:
- Moving walls
- Changing layouts
- Updating utilities
- Expanding square footage
If you’re remodeling a kitchen, adding extra living space, converting a garage, or reconfiguring your floor plan for a larger bathroom remodel, here’s what you need to know before starting work.


Building Permits for Renovations
Building permits for renovations are needed for:
- Room additions, bump-outs, or dormers
- Garage conversions or enclosed porches
- Full gut renovations, including kitchen/bath updates
- Structural changes like beams or support walls
Even replacing windows or adding stairs may require permits, depending on the municipality.
Skipping building permits for your remodeling project can result in failed inspections or lost insurance eligibility, so it’s best to always consult with the permitting office in your town or a licensed contractor to know for sure what requires a permit.
Electrical/Plumbing/Mechanical Permits
Trade permits for electrical, plumbing, and mechanical work are almost always required to account for:
- Rewiring or circuit breaker panel upgrades or replacements
- Moving sinks, toilets, or bathtubs
- Adding or replacing HVAC systems or ductwork rerouting
- Tankless water heaters
- Installing an elevator
CAMA Minor Permit (If Applicable)
If your remodel touches a structure within a CAMA Area of Environmental Concern (AEC), you may still need coastal review—even for work on an existing home.
Zoning & Lot Coverage Approvals
Especially important when you’re adding impervious surface like decks, concrete, or additions in tight-lot communities (Southern Shores, Kill Devil Hills, etc.)
Commercial Construction Permits
If you’re building or renovating for business use, expect more scrutiny. Starting a new business or expanding an existing one carry additional commercial permitting layers.
See our full commercial construction portfolio here.

Commercial Building Permits
Commercial Building Permits include all the requirements of a residential permit, plus:
- Occupancy classification
- Fire egress & suppression systems
- ADA Accessibility Compliance
- Commercial zoning verification
These permits help ensure public safety and legal business operation.
Health Department Approval
Health department approval is essential for restaurants, cafes, salons, and any business involving public health. These approvals include inspection of sinks, grease traps, food prep areas, and more.
Sign Permit
Most Outer Banks towns require permits for signage, both freestanding and on-building. Size and placement are highly regulated. Towns like Nags Head and Kill Devil Hills are especially strict about size and placement.
Trade Permits & Inspections
As with residential builds, commercial spaces need inspections and permits for:
- Plumbing systems
- HVAC/ventilation
- Electrical infrastructure
Work with a licensed general contractor who understands commercial code, especially if you’re converting a home into a business space.
Accessory Structures & Special Cases
Detached sheds, backyard ADUs, and accessory structures on the Outer Banks come with their own set of permitting challenges. While these smaller builds may not seem as complex as a new home or commercial space, they can trigger multiple local, state, and even federal regulations depending on location, size, and use.
Accessory Dwelling Units (ADUs)
As more Outer Banks homeowners look to add guest cottages, in-law suites, or rental income spaces, accessory dwelling units (ADUs) are gaining popularity. However, these mini homes are regulated just like full-sized houses.
Permits you will need to consider for ADUs include:
- Zoning and Density Requirements: Confirm that your property’s zoning district allows for an ADU, and whether there are limits on square footage, setbacks, or the number of dwellings permitted per lot.
- CAMA Review: If your ADU is within 575 ft of public waters, dunes, or wetlands, it falls under a CAMA Area of Environmental Concern (AEC) and may require a Minor or Major Permit depending on scope.
- Septic Capacity Evaluation: In areas without municipal sewer, you must verify that your existing septic system can support the additional bedroom(s). If not, an expanded system or new installation, with its own permitting process, is required.
- Elevation Certificates & Flood Compliance: Most ADUs must be elevated in flood zones and will require engineered foundation plans and elevation certificates to ensure compliance with FEMA floodplain ordinances.
- All Trade Permits: Just like a primary dwelling, your ADU will require electrical, mechanical, and plumbing permits, even for small units with basic kitchens and baths.
Decks, Pools, Sheds, Fences
Even though decks, pools, sheds, and fences are non-habitable, these features can still impact stormwater runoff, floodplain compliance, and lot coverage limits, especially in sensitive areas.
Here’s when you’ll likely need a permit!
Decks
- Required if the deck is over 30 inches above grade
- Triggers zoning approval if it adds impervious surface or increases lot coverage
- CAMA permit needed if in AEC zone (oceanfront, soundside, etc.)
Fences
Fences are generally permitted without review, but not always.
- In flood zones, fencing style and materials must allow water flow (i.e., no solid panel privacy fences)
- Within dune buffers or ocean hazard areas, fences often need CAMA review
Sheds & Storage Buildings
Permits are required for sheds and storage buildings if:
- Over 200 sq ft
- Located within a floodplain (even if smaller)
- Includes electrical wiring
Sheds and storage buildings may count toward total lot coverage, so check with your town’s Planning Department first.
Swimming Pools
Swimming pools always require permits, including:
- Zoning
- CAMA (if in AEC)
- Electrical (for pumps/lights)
- Fencing (for safety code compliance)
Many towns also require a drainage plan to prevent runoff issues, particularly in flood-prone neighborhoods like Kill Devil Hills and Nags Head.
When in doubt, contact the Planning or Building Department in your town before starting work. Failing to get the right permit can delay future sales, void flood insurance coverage, or lead to expensive retroactive corrections.
Where to Get Builder’s Permits in the Outer Banks
Use the chart below to find the coordinating permit office and their website based upon your property’s location and region.
| Region | Permit Office | Website/Link |
| Dare County | Dare County Planning | darenc.gov |
| Nags Head | Nags Head Planning Dept. | nagsheadnc.gov |
| Kill Devil Hills | Building Inspections Dept. | kdhnc.com |
| Kitty Hawk | Town of Kitty Hawk | kittyhawknc.gov |
| Duck | Community Development | townofduck.com |
| Southern Shores | Southern Shores Town Hall | southernshores-nc.gov |
| Currituck County (Corolla) | Currituck Planning | currituckcountync.gov |
Outer Banks Building Permit Checklist
Before you build or renovate a property on the Outer Banks use this permit checklist to confirm you progress:
- Zoning and Use Approval
- Building Permit (new structure or addition)
- CAMA Minor or Major Permit (if applicable)
- Elevation Certificate (if in floodplain)
- Septic/Well Permit or Sewer Tap
- Electrical / Mechanical / Plumbing Permits
- ADA & Fire Plan Approvals (for commercial)
- ARB (Architectural Review Board) Approval (if in select locations of Duck, Southern Shores, etc.)
- Sign Permit (for commercial only)
The most important item for your permit check list is to ensure the contractor you are working with is licensed and insured. Licensed contractors in North Carolina are required to meet standards set by the state, protect clients with insurance, maintain knowledge on codes and updates through continuing education, provide proof of their healthy financials, and continue their licensing credentials.
Working with a licensed and insured general contractor will protect you throughout the permitting and final inspection process. You can also check the North Carolina Licensing Board of General Contractors’ website to gain full peace of mind on your construction partner.
Let Us Handle the Permits So You Don’t Have To
Permitting on the Outer Banks can feel overwhelming, but it does not have to. The red tape behind building permits are a fundamental part of protecting your investment. If you are dreaming up a new oceanfront build, expanding your business footprint, or remodeling a classic cottage, every step should be backed by the right permits.
At Premiere Contracting, Inc., we’ve helped clients across Dare and Currituck counties avoid costly delays, failed inspections, and flood zone missteps by managing the permitting process from day one.
We handle:
- Initial zoning checks and architectural review board coordination
- Full permit documentation for new construction, remodels, and commercial spaces
- Trade permits, CAMA compliance, and elevation certificates
- Communication with municipal offices and inspectors
Our team is based right here in the Outer Banks, serving Kitty Hawk, Duck, Southern Shores, Kill Devil Hills, Nags Head, Corolla, and beyond, so we understand the unique challenges of coastal construction better than anyone.
Want help with your next project?
Reach out for a consultation and let us help you build smarter, not slower.