Premiere Contracting was retained by the owner of the Nags Head Inn to perform remodeling work for the 100 room hotel. The work on the Nags Head Inn was completed in three phases. Phase I consisted of updating the bathrooms with more modern plumbing, countertops, cabinets, ceiling tiles, wallpaper, and interior fixtures. We also removed all the oceanfront windows, doors, and air conditioning units and replaced them with impact-resistant, high-quality windows and door assemblies.
Phase II was more complicated that the first phase as we remodeled the entire tower area of the Nags Head Inn. This phase required the removal of all the glass on the front of the tower. The tower was then reframed with light gauge steel in preparation for the new windows. Specially made galvanized steel brackets were installed for the custom build IPE shutters. The tower was then insulated and resided as well as the trim being painted. The result was a more modern look for the Nags Head Inn tower.
Phase III consisted of a complete retrofit of the pool room. All of the existing exterior windows and doors were removed and replaced. The room was upfitted with a high-tech HVAC system and colorful blue duct sock to control moisture and keep it comfortable all year long.
Images by Elizabeth Neal via Milepost Living Photography.