The Albemarle Carpet metal building sustained heavy damage when an unexpected tornado struck Currituck.  The damage was so extensive that they called in the metal building experts here at Premiere to assess the structure and formulate a plan to reconstruct the building. 

     Working with a local engineering firm, we laid out a plan for retrofit.  We also coordinated with the insurance company on the budget.  The work was completed in a safe and efficient manner.  The result was a structure that was rebuilt to a condition that was better than when it was first constructed. 

Damage

 

Reconstruction